CTBUH Gold Member

GCL Builds

About

Member Since: 2012

Member Offices: Toronto

Website: http://www.gclbuilds.com

GCL Builds is a full-service construction management and general contracting firm.

In depth construction management, strong pre-construction services, sound philosophy, and expertise in estimating and engineering has launched GCL Builds Limited to the forefront of Toronto’s construction industry.

Their vision is to provide the best possible construction services within a safe, stimulating, and inviting environment for our contractors, clients, residents and employees. GCL Builds strives to be the leading construction firm in Toronto. Our experienced management team directs a talented crew of construction professionals dedicated to producing an exceptional, prompt and precise product.

Fields of Expertise

Construction / Contractor

Buildings

Please note that all heights shown in italics/red are estimated heights. These have been calculated based on known floor counts for the building, then extrapolated through analyzing typically hundreds of buildings of the same function on this database that do have confirmed heights. The user should be aware that non-standard building features, such as significant spires or raised entrances / podiums, may affect the accuracy of these estimations.

RANK
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height
1 The St. Regis Toronto
276.9 m / 908  ft
2 Rainier Square
258.2 m / 847  ft
3 Amazon Tower I
159.7 m / 524  ft
4 Amazon Tower II
158.8 m / 521  ft
5 Century Square
116.1 m / 381  ft
6 West 8th
109.7 m / 360  ft
7 Pure Spirit Condominiums
102 m / 335  ft
8 Second & Seneca Building
96 m / 315  ft
9 Tower 333
89.6 m / 294  ft
10 Fifth and Yesler Tower
73.5 m / 241  ft

Awards

Rainier Square

Award of Excellence: Rainier Square

Best Tall Building, by Function, Mixed-Use 2022

Ctbuh Leaders

Mark Garland

Mark Garland

CTBUH Canada Chapter, 2012 – Present

Toronto

Building Completions Timeline

Videos

16 September 2014

Stainless Steel Claddings for High-Rise Architecture

Especially during the last 20 years stainless steel has become an approved and much valued cladding material for sophisticated architecture. Starting with the first architectural...

View all

Research

11 October 2021

Tall Excellence

As the first in-person CTBUH International Conference after the Covid-19 shutdowns in 2020, the 2022 program contains an exuberant and exciting roster of presenters and...

View all

Global News

21 September 2021

Seattle Mixed-Use Tower Has Welcomed Residents

The Residences at Rainier Square have started welcoming their first occupants as of this summer. Located in downtown Seattle, the mixed-use project from Wright Runstad...

View all

Associated companies

Please note that all heights shown in italics/red are estimated heights. These have been calculated based on known floor counts for the building, then extrapolated through analyzing typically hundreds of buildings of the same function on this database that do have confirmed heights. The user should be aware that non-standard building features, such as significant spires or raised entrances / podiums, may affect the accuracy of these estimations.

RANK
Name
Height
1 The St. Regis Toronto

277 m / 908 ft

2 Rainier Square

258 m / 847 ft

3 Amazon Tower I

160 m / 524 ft

4 Amazon Tower II

159 m / 521 ft

5 Century Square

116 m / 381 ft

6 West 8th

110 m / 360 ft

7 Pure Spirit Condominiums

102 m / 335 ft

8 Second & Seneca Building

96 m / 315 ft

9 Tower 333

90 m / 294 ft

10 Fifth and Yesler Tower

74 m / 241 ft

11 Luma

73 m / 240 ft

12 144 Park Condominiums

68 m / 222 ft

13 400 Westlake

67 m / 220 ft

14 Federal Reserve Building

54 m / 177 ft

15 Fife House

47 m

154 ft

Please note that this height is estimated, based on a floor count of 12 floors. The estimation has been arrived at by analyzing 453 other buildings of the same Office / Residential function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
16 1000 Mount Pleasant

43 m / 141 ft

17 The Cardiff

40 m / 130 ft

18 65 Lillian Residences

35 m / 114 ft

19 Platform Condos

34 m / 110 ft

20 The Net

-

Statistics

Average Building Age*

8 Years

Most Common Function*

Mixed-use (50%)

Most Common Material*

Composite (75%)

* Based on 150 m+ buildings currently in the database

Based on 4 buildings over 150 m height with a function
 
Based on 4 buildings over 150 m height with a material
 

Building Completions Timeline

Building Map

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.

Designated Experts

Ctbuh Leaders At GCL Builds

CTBUH Canada Chapter, 2012 – Present

Mark Garland

President, GCL Builds

16 September 2014

Stainless Steel Claddings for High-Rise Architecture

Especially during the last 20 years stainless steel has become an approved and much valued cladding material for sophisticated architecture. Starting with the first architectural...

12 October 2011

Composite Construction of Concrete Shear Cores

Mark Garland from LCL builds presents on the construction of concrete shear cores and the process of how it is done.

11 October 2021

Tall Excellence

CTBUH Journal 2022 Issue III

As the first in-person CTBUH International Conference after the Covid-19 shutdowns in 2020, the 2022 program contains an exuberant and exciting roster of presenters and...

31 December 2012

Year in Review: Tall Trends of 2012

Kevin Brass, Antony Wood & Marty Carver, CTBUH

For the first time in six years the number of tall buildings completed annually around the world declined as the effects of the global financial...

01 December 2012

Canada Grows Taller

CTBUH Research

Twenty-six buildings taller than 150 meters have been built in Canada since 2005 and it added four buildings taller than 200 meters in 2012, the...

21 September 2021

Seattle Mixed-Use Tower Has Welcomed Residents

The Residences at Rainier Square have started welcoming their first occupants as of this summer. Located in downtown Seattle, the mixed-use project from Wright Runstad...

06 May 2021

Seattle High-Rise to Prioritize Occupant Connectivity

The Net, a new office building being built in Seattle, is focused on human well-being, including some aspects in response to the pandemic. The facility...

21 August 2019

Seattle’s Rainier Square Tops Out

With construction topping off, Rainier Square is set to become the second-tallest skyscraper in the city of Seattle. The last steel beam was placed on...

05 April 2019

Amazon Planning to Move Worldwide Operations Team from Seattle to Bellevue

  In yet another sign that Amazon is cooling on its hometown of Seattle, the retail-entertainment-tech giant says it is planning to move its entire...

05 April 2019

Amazon Planning to Move Worldwide Operations Team from Seattle to Bellevue

  In yet another sign that Amazon is cooling on its hometown of Seattle, the retail-entertainment-tech giant says it is planning to move its entire...

04 March 2019

E-Commerce Giant Backs Out of Seattle’s Rainier Square

Long Island City isn’t the only place that Amazon is pulling out of. The tech giant made waves when it threatened to withdraw from its...

CTBUH Initiatives Involving GCL Builds Limited

CTBUH Canada Tours Monde Condominiums

13 March 2019

CTBUH Canada hosted a construction tour of Monde Condominiums, a 44-story residential building designed by Safdie Architects and Quadrangle.

CTBUH Canada Tours YC Condos

21 March 2018

The CTBUH Canada Chapter held a construction tour of YC Condos, a 66-story tower development in downtown Toronto.

CTBUH Canada Hosts Construction Tour of 88 Scott, Toronto

19 July 2017

CTBUH Canada held a construction tour of Toronto's 88 Scott, a 58-story condominium tower with ground-level retail and four levels of office space.

Canada Event Considers “The Story of Marketing Tall Buildings”

20 June 2017

Building up momentum for the CTBUH 2017 Conference in Australia, the CTBUH Canada Chapter held its most recent event at the University of Toronto Faculty Club.

Seattle YPC Tours Troy Block

01 December 2016

The Seattle Chapter of the Young Professionals Committee hosted a site tour of Troy Block, providing significant insight into the relationship of the historical and new.

The Harbour Plaza Construction Tour

18 August 2016

The CTBUH Canada Chapter hosted a construction tour of the Harbour Plaza mixed-use development, soon to be an anchor location in downtown Toronto.